Structural Rebuild covers load-bearing repair through final inspection, coordinated with your Union building department at every stage.
📞 Call +1-866-484-1409 Now
Full GC oversight, not subcontracted piecemeal.
Inspections built into the schedule, not an afterthought.
A written price and schedule before framing begins.
A defined timeline with milestones, not open-ended.

Load-bearing walls rebuilt to current Union, MO code.
Signed off by a structural engineer when warranted.
We manage the timeline so it doesn't stall the project.
Begins only after structural work is signed off.
Where a rebuild starts looking like a home again.
Certificate of occupancy coordinated with Union inspectors.
A technician answers and lines up a structural evaluation.
Initial framing and load evaluation included.
You approve the plan and permits before construction.
Construction proceeds through inspections to a final walkthrough.
"The framing repair passed inspection on the first try, which our contractor friend said doesn't always happen." — Homeowner, Union
"Not dealing with the permitting office directly saved us a lot of stress." — Homeowner, Union, MO
"We expected delays, but the rebuild finished close to the original timeline quoted." — Homeowner, Union
Included as part of the standard scope.
Timeline varies with damage extent.
Yes, full GC licensing covers the entire rebuild scope.
When damage warrants it, engineer sign-off is included.
We provide the paperwork adjusters need.
We keep Union rebuild projects on schedule by managing permitting directly.
